Setting up for Transport
Tools required¶
- Hex key (size 5)
- Hex key (size 2.5)
- Bubble level
Checklist¶
- Switch off all systems.
- Switch off main power switch.
- Unplug in the 220 V power supply.
- Remove Splicer camera lens and wrap in bubble wrap.
- Attach Splicer camera lens cover.
- Disconnect and remove streaming Cameras 1–4.
- Disconnect 48 V power supply to the X, Y, and C axes.
- Disconnect data cables to the X, Y, and C axes.
- Remove the servo to the RGB filter changer.
- Remove the overhead extrusion.
- Remove the tool post to the rotating C axis.
- Fold down table. Store Keyboard in Rako box.
- Disconnect power and signal cables to the screens.
- Remove the screens to the operator area, starting with the left and right screens, followed by the lower screen.
- Wrap screens in bubble wrap and store in Rako box.
- Manually move focus gantry all the way to the back.
- Attach the camera transport locking strap to shift gantry.
- Detach the XY platform to the camera tower unscrewing 2 × M6 screws at the base.
- Raise leveling feet of the XY platform.
- Raise leveling feet of the camera tower.
- Tilt XY Platform vertical on transport mount and secure with ratchet straps.
- Store misc. parts, tools, streaming cameras, lens in Rako box.