Skip to content

Setting up for Transport

Tools required

  • Hex key (size 5)
  • Hex key (size 2.5)
  • Bubble level

Checklist

  • Switch off all systems.
  • Switch off main power switch.
  • Unplug in the 220 V power supply.
  • Remove Splicer camera lens and wrap in bubble wrap.
  • Attach Splicer camera lens cover.
  • Disconnect and remove streaming Cameras 1–4.
  • Disconnect 48 V power supply to the X, Y, and C axes.
  • Disconnect data cables to the X, Y, and C axes.
  • Remove the servo to the RGB filter changer.
  • Remove the overhead extrusion.
  • Remove the tool post to the rotating C axis.
  • Fold down table. Store Keyboard in Rako box.
  • Disconnect power and signal cables to the screens.
  • Remove the screens to the operator area, starting with the left and right screens, followed by the lower screen.
  • Wrap screens in bubble wrap and store in Rako box.
  • Manually move focus gantry all the way to the back.
  • Attach the camera transport locking strap to shift gantry.
  • Detach the XY platform to the camera tower unscrewing 2 × M6 screws at the base.
  • Raise leveling feet of the XY platform.
  • Raise leveling feet of the camera tower.
  • Tilt XY Platform vertical on transport mount and secure with ratchet straps.
  • Store misc. parts, tools, streaming cameras, lens in Rako box.