Skip to content

Setting up after Transport

Tools required

  • Hex key (size 5)
  • Hex key (size 2.5)
  • Bubble level

Checklist

  • Place the camera tower at its final location.
  • Lower the leveling feet of the camera tower.
  • Check the level of the camera tower using the bubble level.
  • Mount the XY platform to the camera tower using 2 × M6 screws at the base.
  • Level the XY platform with the bubble level.
  • Attach the overhead extrusion.
  • Release the camera transport locking strap.
  • Mount the screens to the operator area, starting with the lower screen, followed by the left and right screens.
  • Attach power and signal cables to the screens.
  • Attach the tool post to the rotating C axis.
  • Attach the servo to the RGB filter changer.
  • Connect data cables to the X, Y, and C axes.
  • Attach the 48 V power supply to the X, Y, and C axes.
  • Reconnect the cable for Streaming Camera 2.
  • Reconnect the cable for Streaming Camera 3.
  • Mount and connect Streaming Cameras 1–4.
  • Mount the lens to the Splicer camera.
  • Verify all cable connections.
  • Plug in the 220 V power supply.
  • Check homing of the XY axes at initial startup.

Continue with Startup Checklist